Nacala Next

A proposed integrated industrial development platform at Nacala, comprising five separately structured revenue centres that share one gas supply, one coastal delivery chain and one set of enabling infrastructure.

The platform concept

Mozambique's domestic gas can be exported once as a raw tranche, or it can be converted at home into power, industry and export value. Nacala Next is a proposal for the second route: a single domestic gas allocation, delivered by sea to one coastal node, feeding firm public power, digital capacity, industry and marine fuel.

The platform is scoped around an indicative domestic gas allocation of approximately 200 MMSCFD, about 1.40 million tonnes a year in LNG terms, proposed for Government evaluation. It has not been allocated, and Government is not asked to allocate it ahead of its own evaluation.

Why Nacala

Nacala has a deep natural harbour, an established rail corridor into Malawi and Zambia, and a northern grid that is short of firm generation. The three conditions that an industrial platform needs, port access, corridor logistics and a power deficit worth solving, occur together in one place.

Sponsor role

AP Capital originated the platform. Inter Energies, in which AP Capital holds an investment, is the proponent carrying technical development. Neither party takes construction or operating roles: each project is intended to be built and run by a partner selected for that capability.

How the five revenue centres relate

Each is structured, financed and approved separately. There is no cross-default between them and none carries another's risk. What they share is physical, not financial: one gas allocation, one delivery chain and one set of enabling infrastructure at the node.

That shared infrastructure is also the sequencing constraint. Maritime logistics and regasification is the common dependency, and the onshore projects follow it rather than proceed in parallel with it. Coordinating that sequence, rather than owning the assets, is the platform's function.

Power follows the same discipline. The first tranche of generation is scoped for the public system under a long-term agreement with the national utility, and further tranches are released only as firm demand is contracted, so that capacity is never built ahead of the load that pays for it.

What sits outside the platform

A fertilizer complex and a mineral processing and certification facility were previously scoped inside Nacala Next. Both are now treated as independent projects, promoted and financed separately, and neither is presented as part of this platform. The platform carries a general Industrial Complex Reserve instead, for which in-country mineral processing is the priority candidate use.

Current stage

Concept stage. Gas allocation, land, terminal access, offtake, partners, approvals and financing all remain to be secured. No construction has begun and no final investment decision has been taken on any project.

The five revenue centres

Development project

Central Térmica do Norte

SectorEnergy & Infrastructure
LocationNacala, northern Mozambique
AP Capital roleOriginator and development sponsor
StageConcept stage
Work completedConcept definition, capacity sizing and tranche structure
Next milestoneGovernment evaluation mandate
DependenciesGas allocation, grid interface, LNG delivery chain
Partner soughtLead independent power producer
Project detail →
Development project

Maritime Logistics & Regasification

SectorMaritime & Energy Logistics
LocationNacala, northern Mozambique
AP Capital roleOriginator and development sponsor
StageConcept stage
Work completedDelivery chain defined, terminal class assessed, coastal service role scoped
Next milestoneIndependent marine study
DependenciesGas allocation, port and berth access, vessel availability
Partner soughtIntegrated LNG developer or terminal operator
Project detail →
Development project

AI Data Center

SectorTelecoms & Digital Services
LocationNacala, northern Mozambique
AP Capital roleOriginator and development sponsor
StageConcept stage
Work completedTranche release mechanism defined
Next milestoneFirst confirmed tenant commitment
DependenciesConfirmed tenant demand, firm power, diverse fibre
Partner soughtPowered-campus developer and anchor tenant
Project detail →
Development project

Industrial Complex Reserve

SectorEnergy & Infrastructure
LocationNacala, northern Mozambique
AP Capital roleOriginator and development sponsor
StageConcept stage
Work completedReserve sized within the gas and power envelope
Next milestoneFirst anchor tenant commitment
DependenciesGas allocation, land at the node, firm power, port handling
Partner soughtIndustrial tenants requiring firm power and gas at a port
Project detail →
Development project

LNG Bunkering

SectorMaritime & Energy Logistics
LocationNacala, northern Mozambique
AP Capital roleOriginator and development sponsor
StageConcept stage
Work completedDemand screen and configuration assessment
Next milestoneConfirmation of contracted bunker demand
DependenciesLiquid draw from the terminal, berth and licence
Partner soughtMarine-fuel operator or trader
Project detail →
Nacala Next, conceptual rendering
Conceptual rendering of a proposed development. Not an existing facility and not an engineering design.

Contact

Enquiries

Tell us which sector or project is relevant and we will respond directly.